Thoughts from Everyone: Orange Line

The “Thoughts from Everyone” series is a collection of discussions and analyses of the current system contributed by other transit fans that I personally find interesting. For a full index with ideas on all topics, see here.

This post includes discussions of the Orange Line (OL).

Note: If a discussion is largely about the entire Orange Line but also has a particular focus on a region that it serves, it may be listed in both this page and another relevant “Thoughts from Everyone” page, with a brief note.

Last updated: April 13, 2024 (update OL Transformation)

Service and Operations

Orange Line’s headways vs. number of trains required: Comment 1, Comment 2 (bigeman312 and Delvin4519, Feb 2024)

  • Tables made by the two archBoston users on the number of trains needed to achieve any given headway on the Orange Line, in context of the CRRC delivery.

Orange Line Transformation Program Discussions

The Orange Line Transformation (OLT) Program aims to improve all aspects of the line to enable greater speed, capacity and reliability. It involves new CRRC cars and upgrades to tracks, signals, power substations and Wellington Yard. The program aims for Orange Line trains to run every 4.5 minutes.

Discussion of OLT’s headways and signal upgrades (F-Line to Dudley, April 2024)